Projects

Site Management, Health and Safety

Project Management / Site Management and Quality Control

Site Management and Quality Control

 

Clean Tanks C3001 and C3002 at DFSP Chimwan, Okinawa

  • Vent tanks
  • Perform LOTO
  • Perform Confined Space Entry
  • Enter tanks and removal of residual fuel and sludge
  • Tank cleaning in preparation for API inspection
  • Gas free certification
  • Support during API inspection
  • Tank calibration and strapping chart
  • Close tank and return to service

Site Management and Quality Control

Project Management / Site Management and Quality Control

Site Management and Quality Control

 

Clean, Inspect and Repair Tank 603, DFSP Tsurumi, Japan

  • Repair topside pit
  • Replace the external floating roof with a new aluminum honeycomb floating pan
  • Install telltale holes on reinforcing plates
  • Repair pressure relief loop at the fill and issue nozzles
  • Repair floor projection to asphalt interface
  • Re-coat entire tank interior
  • Replace existing

 

Clean, Inspect and Repair Tank 603, DFSP Tsurumi, Japan

  • Repair topside pit
  • Replace the external floating roof with a new aluminum honeycomb floating pan
  • Install telltale holes on reinforcing plates
  • Repair pressure relief loop at the fill and issue nozzles
  • Repair floor projection to asphalt interface
  • Re-coat entire tank interior
  • Replace existing aluminum geodesic dome roof with a new conventional fixed column steel roof
  • Repair product recovery system
  • Repair internal tank issue piping
  • Repair fill and issue nozzle Double Block and Bleed (DBB) valves
  • Upgrade existing Automatic Tank Gauge (ATG) and manual gauge tubes
  • Repair tank access ways per UFC 3-460-01
  • Install high level alarms per UFC 3-460-01
  • Replace existing nonoperational manual float gauge
  • Install a hydraulically operated high level shut-off valve, shell-mounted float, and
    connecting tubing
  • Install new pipeline supports
  • Install corrosion-resistant / PTFE-coated bolting hardware
  • Install UV-resistant polymer bolt protectors and flange protectors

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

 

Repair POL Facilities
DFSP (OU-1 and OU-2) Tsurumi, Japan

  • Demolition of existing pumps, pipe and supports
  • Pipe manifold construction
  • Pipe coating
  • Pump replacement
  • Weld testing and pipe testing
  • Civil construction and containment
  • Utilidor construction
  • Electrical construction (MCC and Emergency Shut-offs)

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

 

Clean, Inspect and Repair Tanks, DFSP Tsurumi, Japan

  • Tank Cleaning
  • API 653 Inspection
  • Mechanical Repairs
  • Interior and Exterior Coating
  • Tank Calibration

Project Management

Project Management / Site Management and Quality Control

Project Management

 

Repair Pipelines, POL Pier, and Other Components, Iwakuni, Japan

  • Replace all high-point vents and low-point drains
  • Repair pipeline supports
  • Pipeline re-coating
  • Pipeline cleaning via “dumb” pigging
  • Pipeline pressure testing
  • Clean strainers and replacing filter elements and other consumables during pigging

Project Management

Project Management / Site Management and Quality Control

Project Management

 

Clean, Inspect and Repair six Tanks, Sasebo, Japan

  • Coating interior (ceiling and floor) and exterior (roof and shell)
  • Repairs to access structure and handrails
  • Re-plumb several tank columns
  • Dike repairs and concrete cracks
  • Replace Level Control Valves
  • High-high level alarm repair
  • Install new Stilling wells
  • Replace Isolation valves with Double block and bleed valves

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

 

Emergent Pipeline Repairs, DFSP Hakozaki, Japan

  • Replace existing, damaged Expansion joints
  • Repair existing concrete pipe supports
  • Repair I-Beam Supports with new chemical anchors
  • Replace existing pipe
  • Pressure test new pipe and expansion joints
  • Coat new pipe and expansion joints

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

Project Management / Site Management and Quality Control

 

Repair Circulation Loop, DFSP Hachinohe, Japan

  • Replace circulation loop piping
  • Replace Double Block and Bleed Valves
  • Replace Pressure Relief Valves
  • Provide new concrete support foundations
  • Provide new vent valves
  • Coat and stencil new piping and valves
  • Pressure test circulation loop

Project Management

Project Management / Site Management and Quality Control

Project Management

 

Repair Pipelines

DFSP Diego Garcia

  • Install thermal relief bypass piping
  • Replace 16in main tank farm header and DBB valves
  • Excavate and replace Low Point Drains
  • Survey of entire piping system and corrosion/pitting repairs
  • Pipe penetration repairs through tank containment walls
  • New pipe supports and u-bolt installation

Gapconfuels

 Copyright © 2019 General Asia Pacific Consulting and Construction, LLC 

Powered by GoDaddy

We're Hiring!

Welcome! Check out my new announcement.

APPLY NOW!

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept